Transportation of wind turbine blades
- A CSL MPP ship was tasked with safely and securely transporting containers from a loading terminal to a final unloading port.
- The containers were loaded and secured according to the highest safety standards, minimizing the risk of damage or loss during transit, and safely transported to their destination port