Transportation of wind turbine blades

Worldwide

Case study

  • A customer required transportation of turbine blades to a remote wind energy farm construction site.
  • A CSL MPP vessel equipped with specialized onboard grabs and other advanced equipment loaded, transported and unloaded the turbine blades safely and efficiently at the wind energy farm construction site.