Hold Number 1 – Volumes | Cubic metres |
Total Volume | 3,854 |
Volume net 1.1m ullage | 3,461 |
Cement (1.2 t/m3) | 4,273 |
Hold Number 2 – Volumes | Cubic metres |
Total Volume | 5,779 |
Volume net 1.1m ullage | 4,503 |
Cement (1.2 t/m3) | 6,483 |
Hold Number 3 – Volumes | Cubic metres |
Total Volume | 6,145 |
Volume net 1.1m ullage | 5,684 |
Cement (1.2 t/m3) | 6,821 |
Hold Number 4 – Volumes | Cubic metres |
Total Volume | 5,780 |
Volume net 1.1m ullage | 5,423 |
Cement (1,2 t/m3) | 6,508 |
Hold Number 5 – Volumes | Cubic metres |
Total Volume | 5,220 |
Volume net 1.1m ullage | 4,813 |
Cement (1.2 t/m3) | 5,775 |