Subsea pipeline and cable protection support

Gas Condensate Field, Asia

Case study

  • A CSL self-unloading ship shuttled stone from a stone quarry’s marine terminal and completed floating transhipment operations into the fallpipe vessel of a major EPCi company. 
  • Initial phase was completed during 2021 to support undersea piping off the coast of Asia. 
  • CSL’s contracted solution improved installation cycle time and the utilization rate of the fallpipe vessel.